That’s when I think we’ll see the next 2.3 mile stretch of 485 open. Could be wrong about this one, but when NC DOT is involved always go long. Very long.
by Jeff Taylor
That’s when I think we’ll see the next 2.3 mile stretch of 485 open. Could be wrong about this one, but when NC DOT is involved always go long. Very long.